Wednesday, 28 January 2009

The Waiting Game


The booth is still not here.

And we are getting impatient.

But there are problems which we have to solve. Mainly, getting the booth to the studio. So quite a major one really.



It took us ages to find an affordable studio on the ground floor. However, we didn't think of the fact that the driveway to Utrophia is down a cobbled lane. So the shipping company cannot take it to the front door. They will leave it at the entrance to the driveway, on the street.

So we have the following options:

a) Hire a pallet truck. Probably not suitable due to the slope and the uneven ground.
b) Hire some humans who know how to shift a 400kg weight. Very expensive.
c) Hire a van, transfer the booth from the truck to the van and drive it the very short distance to the front door. At the moment this is the most feasible.
d) Get a dolly truck. Unsafe on the even ground but ideal for moving it around once it is in the studio.

Not to mention once we get it in, we have to be able to get it out again!

Apart from that, preparations are going nicely. Our studio is like a fridge at present, as it is on the ground floor of a warehouse type building with a concrete floor. We have carpetted it and fitted insulation into the walls (the carpetting documented by Joe Plommer here). Just a lick of paint and all set for the new addition!

No comments:

Post a Comment